View Details
Bid Classification: |
Construction
|
---|---|
Bid Type: | Request for Quotation |
Bid Number: | RFQ-2022-84 |
Bid Name: | South East Sector Transportation System 19th St - Gaetz Ave to Irwin Ave |
Bid Status: | Awarded |
Bid Awarded Date: | Fri Jan 13, 2023 (MST) |
Bid Closing Date: | Wed Dec 21, 2022 1:30:59 PM (MST) |
Question Deadline: | Thu Dec 15, 2022 1:30:00 PM (MST) |
Duration in months: | 21 |
Negotiation Type: | Refer to project document |
Condition for Participation: | Refer to project document |
Electronic Auctions: | Not Applicable |
Language for Bid Submissions: | English unless specified in the bid document |
Submission Type: | Online Submissions Only |
Submission Address: | Online Submissions Only |
Public Opening: | No |
Description: |
This project consists of four major components. The first component of the work includes the reconstruction of 19 Street. The asphalt along 19 Street is in poor condition and the City of Red Deer will be reconstructing 19 Street between Gaetz Avenue and Irwin Avenue. The new pavement structure is deeper than the existing pavement structure and the existing curb and gutter will mostly remain in place, with all pinned on curb being replaced with curb and gutter. The construction will be in close proximity to two wetland areas, where a subdrain will be installed along the bottom of the excavation to convey groundwater to the storm sewer system. The second component of the work includes reconstructing the intersection of 19 Street with 40 Avenue as a multi-lane roundabout. The roundabout will have a concrete pavement surface. The ancillary work at the intersection includes salvaging the existing traffic signals, relocation of existing streetlights and the installation of new streetlights, the burial of an overhead power line, the installation of Rectangular Rapid Flashing Beacons (RRFB), storm sewer relocation, and subdrains. The third component of the work is the construction of an asphalt multi-use trail along the north side of 19 Street from Piper Creek to 40 Avenue. The fourth and provisional component of the work is the construction of a right in/right out access from 40 Avenue to the Living Stones Church. The work will include the construction of a right in/right out access, a northbound left turn bay, saw cutting and removal of a portion of the existing asphalt access road, construction of a new sound attenuation berm, and landscaping along the berm. |
Bid Document Access: | Bid Opportunity notices and awards and a free preview of the bid documents is available on this site free of charge without registration. Please note, some documents may be secured and you will be required to register for the bid to download and view the documents. There is no cost to obtain an unsecured version of the document and /or to participate in this solicitation. |
Trade Agreements: |
Show Trade Agreements [+]
Canada-European Union Comprehensive Economic and Trade Agreement (CETA)
Canadian Free Trade Agreement (CFTA) Please refer to Tender Description or Tender Documents |
Categories: |
Show Categories [+]
|
Meeting Locations
The following are the meeting times and locations for the bid: